Waterfall Model in Custom Software Development

Did you know one of the first methods of making software was designed like a Waterfall methodology? Just like water flows down from one level to another, the Waterfall Model moves through different stages in order. You finish one step completely, then move to the next, without going back. This structured approach made it one of the earliest project management techniques in software engineering.

This model is very old but still important. It works in a straight line. First, people collect requirements. Then they design, build the code, test it, and finally maintain the system. Everything happens one after the other, just like falling water. This clear development lifecycle made it popular for projects with strict project scope and regulatory requirements.

The name “Waterfall” comes from this clear flow. It made projects easy to plan, control, and explain. In custom software development, it became the base for delivering projects in a structured way. Even though many new methods and iterative approaches exist now, Waterfall is still remembered as the starting point of modern software development methodology. It continues to guide product development in industries that need quality assurance and compliance.

Phases of the Waterfall Model

The Waterfall Model follows a straight path where one step finishes before the next begins. This makes it suitable for projects with fixed scope and clear documentation. Here’s how each phase works in custom software development:

Requirement Gathering

This is the first stage where all the details of the project are collected from the client. The team notes down what the software must achieve and the problems it should solve. When requirements are clear at this stage, the entire project runs smoothly. But if something is missed, it becomes very hard and costly to add later. That is why many custom projects spend extra time here, especially in industries like banking or healthcare where regulatory requirements are strict.

System Design

In this stage, the technical structure is prepared. Developers and architects decide how the software will look, how the data will move, and what tools or platforms should be used. A strong design reduces confusion later during coding. But if requirements change after design is fixed, the whole plan may need to be redone. Teams often ask themselves if the design meets the business goals without creating extra cost. Clear system design also prepares the way for proper unit testing and System Testing in later stages.

Implementation (Coding)

Once the design is ready, developers begin writing the actual code. Each part of the system is built step by step and then combined into a complete product. Coding usually takes a big part of the project’s timeline, often around one-third of the total effort. Since the process is strict, developers must follow the design closely. If the earlier steps were not accurate, the coding work can end up wasted. This stage is also called the implementation phase in the software development methodology.

Testing & Verification

At this stage, the software is tested to check whether it works as expected. Unit testing is done on smaller modules, while System Testing checks the complete product. Any errors are fixed, and the product is verified against the original requirements. Testing often takes up 20-30% of the total project effort, which shows how important it is for quality assurance. This stage gives the client confidence that the system is working properly before launch. The challenge is that testing happens late in the process, so if big errors are found, they may require large fixes and delays. For critical systems like hospital software, this stage is given extra importance because even a small mistake can affect lives.

Deployment & Maintenance

The final stage is where the software is launched for use. After deployment, the team continues with the maintenance phase, which includes updates, security patches, and small fixes. Clients get a working solution with long-term support. However, if major changes are requested, it can be slow and expensive because the Waterfall process does not easily allow going back to earlier steps. For this reason, smart planning at the beginning helps reduce future costs.

Strengths of the Waterfall Model

The Waterfall development model follows a strict order where one phase must be finished before moving to the next. This makes it almost impossible to skip a step or miss important details. Teams and clients can clearly see progress because every milestone is documented. It brings confidence that the project is moving forward in a controlled and disciplined way, which is why it remains one of the most recognized project management methodologies.

  • Clear checkpoints after each stage
  • Easy to track progress across the Software Development Lifecycle
  • Everyone knows what has been done and what comes next

What if my budget is fixed?

 One of the biggest strengths of Waterfall project management is its predictable costs. Since requirements specification is gathered at the beginning and the system design phase is fixed early, the budget is easier to control. Businesses know what resources, time, and money will be needed before the project even starts. This reduces financial risks and gives clients peace of mind that the project will not spiral out of budget.

  • Planning prevents surprise expenses
  • Businesses can lock project timelines and costs in advance
  • Safer for clients who want cost certainty

Can it work in regulated industries?

 Yes. The Waterfall Software Development Model is often the first choice for government, defense, and healthcare projects where safety and compliance cannot be compromised. This is because every step is fully documented, making it easier to prove that rules and standards were followed. Regulators prefer this model because audits and approvals become smoother with written records. It ensures both accountability and transparency throughout the development lifecycle.

  • Strong documentation for every phase
  • Smooth approval in industries with strict rules
  • Trusted method for safety-critical systems

What if my requirements are stable and clear? 

The Waterfall Software Development Model is highly effective when the requirements analysis is well understood from the start and unlikely to change. In these cases, it saves both time and money by reducing unnecessary back-and-forth. The clear structure ensures that the end product matches the initial vision without confusion. This makes it a reliable choice for businesses that want results delivered on schedule with minimum rework.

  • Less confusion due to fixed scope
  • Faster completion with fewer changes
  • Reliable results for long-term use

Limitations to Know: Why Waterfall Isn’t Always a Fit

Inflexibility with Changing Requirements

In the Waterfall project management model, once requirements are documented and approved, they rarely change. If a business need shifts mid-project, the team must go back to earlier stages, which can cause big delays and extra cost. Agile development solves this by allowing teams to adapt to changes at any stage without redoing everything.

Delayed Testing Feedback

Why wait until the very end to discover whether the system works? In Waterfall, testing comes only after coding is complete, which means major bugs or design issues often appear late in the process. This slows delivery and increases expenses. Agile and hybrid approaches test at every step, catching issues earlier when they are easier to fix.

Higher Risks of Misalignment with User Needs

The biggest challenge with Waterfall is that client feedback or customer feedback comes too late. By the time the product reaches testing or the deployment phase, user needs may have shifted or been misunderstood. This creates a gap between what was planned and what users actually want. Agile practices close this gap by bringing in feedback throughout the process, which improves Customer Satisfaction.

Rework if Mistakes Are Found Late

What if the initial requirement was wrong? In Waterfall, such errors often remain hidden until testing or deployment, forcing teams to redo entire modules. This wastes effort and damages project timelines. Agile and hybrid methods reduce this risk by checking requirements and validating features continuously, so mistakes are caught much earlier.

Modern Use of the Waterfall Model

Still Trusted in Key Industries

Even today, many industries rely on the Waterfall Software Development Model because of its structure and clear process. Banks use it when building secure payment systems where software architecture must follow rules exactly. Defense and aerospace projects also prefer Waterfall since safety and compliance cannot be compromised. Healthcare and government projects choose it for the same reason, predictable costs, strict documentation, and no room for errors.

How Hybrid Models Are Used Today

Modern companies often blend Waterfall with Agile methods. For example, they may use Waterfall to design and document the main system but apply Agile for smaller updates, user interfaces, and new features. This mix gives them the discipline of Waterfall along with the flexibility of Agile. It helps them balance stability with speed, which is crucial in digital transformation projects.

Waterfall for the foundation

Teams use Waterfall to handle planning, compliance, and system design phase because it gives structure and clear documentation. This makes the core software stable and easier to manage in industries where accuracy is critical.

Agile for flexibility

Agile is added on top to manage quick updates, user-driven changes, and faster feature releases. This way, businesses can adapt to modern needs without losing the order and safety that Waterfall provides.

A Trusted Choice for Clarity

While Agile is popular in most businesses, Waterfall has not disappeared. It continues to be the right choice for projects where rules, safety, and structure are more important than fast changes. For a custom software development company, it proves that sometimes the old ways are still the most reliable when clarity and confidence are needed. Using the right project management tool and version control system further strengthens its effectiveness.

Related Terms

Agile Model

Agile is a modern approach where projects are broken into smaller parts and delivered in short cycles. Unlike Waterfall, it allows changes at any stage and focuses on continuous customer feedback.

Spiral Model

This model combines Waterfall and prototyping. It repeats planning, design, coding, and testing in cycles, reducing risks in complex projects.

Incremental Model

In this approach, software is built and delivered in smaller sections. Each section works on its own and adds to the overall system step by step.

V-Model (Verification and Validation)

This model is like Waterfall but with testing planned alongside each stage. It focuses on quality by matching every development step with a test stage.

We care about your data in our privacy policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Trusted by founders and teams who’ve built products at...

Company logoCompany logoCompany logoCompany logoCompany logoCompany logo

Related Terms

Need Software Development Services

We prioritize clients' business goals, user needs, and unique features to create human-centered products that drive value, using proven processes and methods.

Get in touch today

Ready to revolutionize your business? Tap into the future with our expert digital solutions. Contact us now for a free consultation!

By continuing you agree to our Privacy Policy
Check - Elements Webflow Library - BRIX Templates

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.